Plant Expansions
Production line
upgrades Plant expansions Capital equipment installations Tank farms Waste water treatment plants Cooling towers and cooling
water systems Autoclaves Robotic manufacturing cells Transformer substations
Project Management
and Administration
Bid documents preparation
Bid tender proceedings
Procurement of equipment
Construction monitoring meetings and site inspections
Verification of progress payments, extras and credits
Deficiency lists Certificates
of substantial and total performance
Engineering Studies
Feasibility studies
Justification of capital budget requests
Energy performance
surveys Government grant studies
Equipment deficiency reviews & improvement proposals Water cooling and consumption
studies Magnetic
field interference surveys
Plans and Specifications
Engineering design
Preparation of plans and detailed drawings
CAD drafting Instructions
to contractor Detailed
specifications in National Master Spec (NMS) format
Bills of material Pipe
and cable schedules
Performance standards
Instrumentation ISA sheets
P&ID drawings
Contract Documents
General contract specifications CCDC documents
Performance Bond
insurance specifications
Contract standard
agreements NMS specifications
Minutes of meetings
Certification of payment draws Certificates of work completion
Safety and Environmental
Consulting
OHSA reviews and certifications
Explosive hazard classification
Explosive dust collection
Plant air exhaust reports
Waste water treatment plant improvements
Pre-Start Health & Safety Reviews